Text Only
Accessibility Options
Default Text Size icon Large Text Size icon Largest Text Size icon
Set your Postcode This will personalise content such as news & events with the latest from your area.
Register For
Skip Content Skip Content

Decision Log

document1

All decisions of significant public interest made by the Police and Crime Commissioner for South Yorkshire are recorded below in accordance with the Commissioner’s  Decision Making Framework  and Decision Making Flowchart.

Decisions made at the Public Accountability Board, Budget Meeting and Regional Collaboration Board are captured in the minutes of these meetings which can be found here .

Please find below; a log of significant decisions made by the Police and Crime Commissioner and, the Office of the Police and Crime Commissioner.

Decisions will be published on the website.

2017/18 Decisions

 Date Ref    Issue                                                                                                                                  Decision 
04/12/17 17/041       Barnsley Chronicle Stronger Together Grant Scheme                                       Supported the proposal  
27/11/17 17/038       PCC Community Grant Scheme 2017/18 - Nov 2017                                        Supported the proposal  
23/11/17 17/036       Request for Financial Assistance                                                                          Application Refused
 
07/11/17 17/035       PCC Community Grant Scheme 2017/18 - Nov 2017                                        Supported the proposal  
07/11/17 17/033      Externally funded project - Sheffield University Grant                                          Supported the proposal  
02/11/17 17/034       Co-Funding for the Counrtywide Domestic Abuse Perpetratpr Programme  Supported the proposal  
18/10/17 17/031      Disposal of Dinnington Police Building                                                                  Supported the proposal  
17/10/17 17/032     O'SARA Model Training                                                                                                Supported the proposal  
26/09/17 17/023     National Driver Offender Retraining Scheme                                                          Supported the proposal  
20/09/17 17/030     PCC Community Grant Scheme 2017/18 - Sept 2017                                          Supported the proposal  
07/09/17 17/027    Changes to Contract Standing Orders                                                                       Supported the proposal  
05/09/17 17/026    PCC Community Grant Scheme 2017/18 - Aug 2017                                             Supported the proposal  
23/08/17 17/025    Disposal of Land, 12 - 14 Bawtry Rd, Rotherham                                                    Supported the proposal  
23/08/17 17/024    Special Services Charging Rates - September 2017                                              Supported the proposal  
26/07/17 17/014     Disposal of Bentley Police Building                                                                            Supported the proposal  
19/07/17 17/020    PCC Community Grant Scheme 2017/18 - Recommendations July 2017          Supported the proposal  
03/07/17 17/013    Disposal of Cusworth Police Building                                                                         Supported the proposal    
26/06/17 17/019    PCC Community Grant Scheme 2017/18 - Recommendations June 2017        Supported the proposal  
20/06/17 17/018    National Collaboration Agreement - ACRO Criminal Records Office                    Supported the proposal  
13/06/17 17/017    Barnsley Town Centre Team                                                                                          Supported the proposal  
06/06/17 17/012    Disposal of Ring Farm, former mounted section base                                            Supported the proposal  
06/06/17 17/011    Disposal of Roman Ridge Police Building                                                                 Supported the proposal  
06/06/17 17/010    Disposal of Holberry Gardens Police Post                                                                 Supported the proposal  
25/05/17 17/015     IT Upgrade                                                                                                                       Supported the proposal  
11/04/17 17/008    Funding ext for the DMBC Perpetrator Domestic Abuse Programme                   Supported the proposal  
11/04/17 17/007    Continuation funding of 'Together for Mental Wellbeing' project in Rotherham   Supported the proposal  
10/04/17 17/006    Pilot Micro Grant Scheme                                                                                               Supported the proposal  
10/04/17 17/005    Ministry of Justice - Victim Services Budget 2017-2018                                           Supported the proposal  
06/04/17 17/004    Addition of CONNECT Mirror POLE and increment to support hours                    Supported the proposal  
06/04/17 17/003    Change to Contact Management Soution                                                                   Supported the proposal  
 04/04/17 17/002     PIF Dashcams                                                                                                                 Supported the Proposal  
 04/04/17 17/001    Debt Write off                                                                                                                    Supported the Proposal   

2016/17 Decisions

 Date Ref            Issue Decision
14/03/17

16/054

              National Collaboration Agreement with NABIS   Supported the Proposal
14/03/17

16/052

              CONNECT Training Resource   Supported the Proposal
08/03/17

16/053

              External Funded Project - Speed Enforcement                 on smart motorway scheme   Supported the Proposal
23/02/17

16/050

              Operation Stovewood accomodation                                   requirements   Supported the Proposal
21/02/17

16/051

              Request for Financial Assistance   Supported the Proposal
15/02/17

16/049

   

Revenue Budget & Capital Programme 2017/18

  Supported the Proposal
15/02/17

16/048

 

 

Council Tax and Precept for 2017/18

  Supported the proposal
07/02/17

16/046

 

 

Motor insurance claim

  Supported the proposal
 02/02/17

16/045 

 

 

Protected Pension age 

  Supported the proposal
01/02/17

16/042

 

 

Sale of Woodhouse Police Station

 

Supported the proposal

27/01/17

16/043

 

 

Police building - Mossway, upgrade

   Supported the proposal
25/01/17

16/047

 

 

YOYO Awareness Campaign

 

Supported the proposal

23/01/17

16/044

 

 

SY Vulnerable Victim / Witness remote video link

 

Supported the proposal

03/01/17

16/041

 

 

Commissioner Community Grant Scheme 2016/2017 – Panel recommendations October 2016 

 

 Supported the proposal 

22/12/16

16/040

 

 

Uplift the Business Change Directorate 

 

 Agreed to uplift the Business Change Directorate staffing

22/12/16

16/039

 

 

Uplift in staff within the Performance and Governance Team

 

 Supported the proposal

15/12/16

16/038

 

 

Cycle to work scheme 

 

 Supported the proposal

28/11/16

16/037

 

 

Externally funded project – Safer Roads Partnership contribution to
running costs of the premises 

 

 Approved £135,00 over 3 years

22/11/16

16/036

 

 

Complaint against Chief Constable 

 

 Not to uphold the complaint

14/11/16

16/035

 

 

Additional services and software funding 

 

Agreed to support the allocation of existing Programme funding for additional services and software for delivery of fully integrated criminal justice and investigation records management system for South Yorkshire and Humberside Police

26/10/16

16/033

 

 

Collaboration Agreement to procure Protective Personnel Carriers

 

 Agreed to be part of the consortium

10/10/16

 16/032

 

 

Commissioner Community Grant Scheme 2016/2017 

 

Approved allocations from the Community Grant Scheme budget for 2016/17 totalling £15,820

12/10/16

16/031

 

 

2016/17 Revised approach to the Unified Communications Project Timeline 

 

That £955,582 of the 2016/17 Unified Communications budget be carried forward to 2017/18 to allow the stability of infrastructure for the duration of the Contact Management Call Handling deployment

The revised 2016/17 budget of £200,000 to enable the continued rationalisation of equipment as opportunities arise through site refurbishments and the continuation of work developing Skype for Business and connectivity to further enable agile working and the mobility projects 

12/10/16

16/030

 

 

Revised IS Infrastructure Asset Rationalisation and Investment Strategy 

 

The 2015/16 slippage of £377,547 to spend against the revised plan, including £309,050 from the 2016/17 budget allocation totalling £686,697

The 2016/17 slippage of £ 278,283 related network security due to the delay of readiness of the Data Centre, priority of force programmes and resource capacity

12/10/16

16/029

 

 

Refurbishment of Niagara Sports and Social Club 

 

 Approved funding for the refurbishment of Niagara

29/09/16

16/027

 

 

Call upon CC Crompton to resign

 

Decision under S38(3) Police Reform and Social Responsibility Act 2011 to call upon Chief Constable Crompton to resign from the post of Chief Constable of South Yorkshire Police

15/09/16

16/026

 

 

Suspension of Chief Constable

 

 To continue the suspension of Mr David Crompton, CC of SYP

19/08/16

16/025

 

 

Complaint Against Chief Constable

 

 PCC determind that there is no case to answer

16/08/16

16/024

 

 

Complaint Against Interim Chief Constable

 

Not to record the complaint in accordancce with Section 12 of the   Police Refrom Act 2002

15/08/16

16/023

 

 

Proposed removal of Chief Constable Crompton

 

 Proposed removal of Chief Constable Crompton

15/0816

16/022

 

 

Suspension of Chief Constable 

 

 To continue the suspension of Mr David Crompton, CC of SYP

28/07/16

16/021

 

 

Hammerton Road Police Station

 

To support the demolition of Hammerton Road Police Station and arrange a further meeting with local residents and councillors to update and consider the future

28/07/16

16/020

 

 

Special Services Charging Rates - 1st September 2016

 

 To agree special Services rates effective 1/9/16

27/07/16

16/019

 

 

Disposal of Police properties identified as surplus

 

To agree in principle to the disposal of Police properties identified as surplus and that business cases evidencing consultation with local communities and operational impact will be provided on a case by case ahead of any actual disposal.

27/07/16

16/018

 

 

Disposal of Wincobank Section Station

 

To agree to the disposal of Wincobank Section Station in line with the Estates Strategy and Estates Board recommendations

28/07/16

16/017

 

 

Funding for Archiving Orgreave Material

 

 Funding from reserves for 2016/17 agreed. Any expenditure during    2017/18 should be offset against reductions in expeniture

22/07/16

16/016

 

 

Creation of a Major Incident Review Team

 

The PCC agreed to utilise reserves in order to invest in the establishment of a Major Incident Review Team                                 

22/07/16

16/015

 

 

Appointment of Interim Chief Constable

 

Collaborative secondment of the Deputy Chief Constable of Durham Constabulary to the role of Interim Chief Constable of South Yorkshire Police. See link for Decision Record. Section 22 Collaboration Agreement terminated.

15/07/16

16/014

 

 

Suspension of Chief  Constable

 

To continue the suspension of Mr David Crompton, CC of SYP

05/07/16

16/013

 

 

Amendment of 2016/17  revenue budget

 

The PCC agreed an amendment to the 2016/17 revenue budget to save the necessary planning time to allow the Force to re-design the service delivery model, as proposed in the ‘Peer Support Review’

05/07/16

16/012

 

 

Peer review - South Yorkshire Police

 

The PCC agreed the following actions on receipt of the Peer Support Review interim report into SYP 1) Findings of the Report be reported to the PCC's next Public Accountability Board and 2) a detailed plan to address the findings of the Review and be reported to future PAB

30/06/16

16/011

 

 

Request for Financial  Assistance

 

The PCC declined the request for financial assistance

27/06/16

16/010

 

 

        Complaint                

 

To record a complaint aginst Chief Constable Crompton in accordance with paragraph 2 of Schedule 3 of the Police Refrom Act 2002

24/06/16

16/009 

 

               

        External Funding Project 

 

External Funding Project - Outwood Academies 

22/06/16

16/008a

 

             

       Wetherby YOI Link Officer

 

To approve funding contribution of the project on the terms set out in the decision record

07/06/16

16/008

 

 

        Complaint

 

The PCC recorded a complaint made against Cheif Constable Crompton and agreed for this matter to be referred to the independent Police Complaints Commission.

03/06/16

16/007 

 

 

Approval of inward investment projects

 

Approval of inward investment project. Meadowhall Grant, Sheffield Moor PC, Sheffield Business Improvement District Sgt post

16/05/16

16/006

 

 

Member Expenses and Allowances

 

To increase transparency and consistency between the PCC's various committees.

08/07/16

16/004

 

 

Confirmation Hearing

 

In accordance with the requirements of Schedule 8 of the Police Reform and Social Responsibility Act 2011, The Police & Crime Panel met and agreed that the Police and Crime Commissioner should be recommended to proceed with Mr Watson’s appointment from the 1st December 2016. 

03/05/16

16/003     

 

 

Appt of Interim Chief Constable

 

Collaborative Secondment of the Chief Constable of North Yorkshire Police to the role of Interim Chief Constable of South Yorkshire Police.  See link for Decision Record. S22 Collaboration Agreement terminated.  See Decision Record 16/004 for appointment of Interim Chief Constable  Watson.                 

03/06/16

 16/002b

 

 

Suspension of Chief  Constable 

 

 Suspension of Chief Constable

27/04/16

16/002

 

 

Suspension of Chief Constable

 

Suspension of Chief Constable

2015/16 Decisions

Date Ref                 Issue            Decision  
29/03/16

15/023 

           Microsoft                            Enterprise                          Licensing 

      A decision has been made regarding the current Microsoft Enterprise Licensing                 agreement.

 

29/03/16

15/022

           National Police                  Chaplaincy

      The PCC agreed a financial commitment to support a full time centrally funded                   National Police Chaplain.

 

29/03/16

15/021

          Hillsborough                     Inquests

       An application for financial assistance for officers of federated rank regarding the              Hillsborough Inquests.  This decision links to decision 13/05515/003 & 15/011.                See link for details. Fact Sheet also available

 

18/03/16

15/020 

          Commissioning               Plan 2016-17

        Partnership & Commissioning Budget 2016-17 has been agreed.

 

18/03/16

15/019

         MOJ - Victim                      Services Grant                  2016-17

        The PCC accepted the MOJ Victim Services Grant.

 

27/01/16

15/018

         ANPR Camera                  Replacement

        Replacement of fixed site ANPR camera's, with assets that have greater flexibility               and can be deployed anywhere.

 

27/01/16

15/017

        Citizen Interaction             Technologies -                 CITYCoP

         Creating technological tools, to assist citizen and community policing liaison.

 

05/01/16

15/016

        Priority Based                   Budgeting                           Services

         Tender exercise to provide Priority Based Budgeting Services to support the                         Strategic Partnership Programme.

 

14/12/15

15/015

         Hillsbrorough                    Inquests

         An application for financial assistance for officers of federated rank regarding the              Hillsborough Inquests.  This decision links to decision 13/055, 15/003 & 15/011.                See link for details. Fact Sheet also available

 

07/12/15

15/014   

         Police Innovation              Fund Bids 

         See Governance and Assurance Board minutes for details.  See link for details.

 

07/12/15 

15/013     

         Desktop                              Replacement                    Programme

         See Governance and Assurance Board minutes for details.  See link for details.

 

07/12/15

15/012

          Freedom City                     Initiative 

          See Governance and Assurance Board minutes for details. See link for details.  

 

14/10/15

15/011

Hillsborough Inquests

A decision was made following a review of financial assistance for Hillsborough costs. See link for details. Fact Sheet also available.

 

06/10/15

15/010

Custody Estates Programme - Budget update

The PCC determined that additional costs were unavoidable in the context of the overall strategy to deliver substantial revenue savings and deliver minimum standards.  

 

 09/09/15 

15/009

Investment Limits

A temporary increase in investment limits has been agreed. 

 

29/07/15

15/008

Your Voice Counts

A decision was made concerning the 'Your Voice Counts' survey, at the Governance and Assurance Board Meeting.  See link for details.

 

27/07/15

15/007

Change in Special Services Rates Policy

The PCC agreed to a change in the ‘Special Services Rates’ policy. 

 

30/06/15

15/006

Domestic Abuse Survey

A decision was made at the Governance & Assurance Board meeting, to commence a survey of victims of domestic abuse across South Yorkshire.  See link for details.

 

30/06/15

15/005

Community Grant Scheme

The Police & Crime Commissioners Community Grant Scheme 2015/16, agreed to award a total of £260,917.78 in grants.  

 

15/06/15

15/004

Change in Charging Policy

The PCC has agreed to a change in the ‘SYP charging policy in relation to policing events’ policy.

 

08/06/15

15/003

Hillsborough Inquests

An application for financial assistance for officers of federated rank regarding the Hillsborough Inquests.  This decision links to decision 13/055 (04.03.14).  See link for details.  Fact Sheet also available.

 

 08/06/15

15/002

Hillsborough Inquests 

An application for financial assistance for an officer regarding the Hillsborough Inquests has been agreed in principal by the PCC.   This decision links to decision 13/055 (04.03.14).  See link for details.  Fact Sheet also available.

 

11/05/15

15/001

Early Investigative Advice - RASSO pilot

The PCC has agreed to support a 1 year pilot of a CPS Investigative Advise for Rape and Serious Sexual Offences (RASSO) lawyer, to take place in SYP force area. Suffolk, Norfolk & Nottinghamshire forces are also running this pilot.  

 

 

2014/15 Decisions

Date Ref                  Issue            Decision          
31/03/15

14/052

Meadowhall Grant

The PCC approved the funding of £80,000 to support policing operations at Meadowhall Shopping Centre from the Meadowhall Centre.

 

31/05/15

14/051

Operation Ben

The PCC agreed to grant funding from the Home Office of £700,000 in relation to ongoing investigation into the missing person Ben Needham.

 

31/05/15

14/050

Robin Hood Doncaster Sheffield Airport (RHADS) Funding 2014/15

The PCC agreed to the receipt of funding:  Amounting to £99k from Home Office to assist in the policing of Robin Hood Doncaster Sheffield Airport.

 

31/03/15

14/049

Safer Roads Partnership: PC Seconded

The PC agreed to the receipt of grant funding from the Safer Roads             Partnership of £55,000 to provide an operational police officer to support the delivery of the partnerships interventions.

 

31/03/15

14/048

Safer Roads Partnership Countywide Road Safety Officer

The PCC approved grant funding from the Safer Roads Partnersip of £30,000 for 2015/16 and £30,000 for 2016/17.

 

31/03/15

14/047

Write-off, of obsolete stock

The PCC approved to write -off the identified stock deemed obsolete, at a   value of £58, 513.

 

11/03/15

14/046

Insurance Contract

The PCC agreed the Insurance Contract as per reports and                           recommendations.

 

24/02/15

14/045

Revenue Budget, Counci Tax and Precept for 2015/16

The PCC approved:   Revenue Budget, council tax requirement of                 £49,144,036.00, a basic amount of council tax of £148.16 (1.95%)

           

          PDF

23/02/15

14/044

Solar Panels

The PCC agreed to sign a 20 year lease agreement with Sheffield               Renewables. permitting the installation of solar panels at Attercliffe Police   Station to support a sustainable local community project, saving £681 and 12 tonnes of carbon per annum.

 

02/02/15

14/043

IBM - i2 Suite of Products

The PCC agreed to the IBM i2 "acess for all" proposal for the period 1st March 2015 - 28th February 2016 to ensure South Yorkshire Police train access to key intelligence tools.

 

02/02/15

14/042

Application for Membership of the Road Safety Trust

The PC applied for membership of the Road Safety Trust as the legal           contracting entity for South Yorkshire Police.

 

30/01/15

14/041

Hillsborough Inquests

The PCC approved an application submitted on behalf of a retired officer for financial assistance for his legal representation in the Hillsborough Inquests. The financial assistance to be subjected to funding conditions. Fact Sheet available

 

28/01/15

14/040

Victims and Survivors of Chil Sexual Exploitation

The PCC requested the setting up of a panel whose membership would be made up of victims and survivors of child sexual exploitation.

 

08/01/15

14/039

Procurement of invoice automation software for SYP

The PCC agreed funding to support the project for invoice automation.

 

08/01/15

14/038

SYPolice Mounted Branch

The PCC agreed to a share/joint mounted unit, with one management         structure, based at Carr Gate, Wakefield.

 

11/12/14

14/037

Vehicle Telematics

The PCC agreed to support the progression of purchase and installation of full vehicle telematics system.

 

11/12/14

14/036

PP Unit - Additional resources

The PCC agreed to provide a total uplift of 62 staff within the Public               Protection Unit of South Yorkshire Police.

 

11/11/14

14/035

Chief Police Officers' staff Association - Professional Indemnity Insurance

The PCC agreed payment of the Professional Indemnity Insurance for         October 2014 to March 2015.

       PDF

31/10/14

14/034

Schengen Information Systems ii

The PCC agreed to fund the costs for the Schengen project

        PDF 

30/10/14

14/033

Recurring Grants

The following was agreed in summary: All recruitment grants are excluded from the requirement of PCC approval due to staffing already in place, risks, exit strategy previously considered etc.  Change the authorisation limit for the PCC from £50000 to £100000. Carry forward underspends/balances will not require re approval and will slip as appropriate so long as the spend will be in line with the initial proposal.       Grants for authorisation levels are dependent on the life of the grant known at the time.  

 

30/10/14

14/032

Disposal of Doncaster Garage

The PCC agreed to the disposal of the Dncaster Garage

 

   

 

 
 
 
Powered by Contensis